Construction waste removal is currently a rather messy process. Under green-works management requirements, street-level urban-management rules, safe-construction requirements, PM2.5 dust regulations and complaints from nearby residents, waste removal faces unprecedented pressure. To collect and clear waste without penalties, complaints or work stoppages, sites have devised a variety of makeshift methods, commonly including: A simple waste chute fabricated on site from formwork or plywood; A suspended double-wall corrugated pipe used as a waste duct, or a pipe welded from oil drums; Waste lowered in suspended plastic paint buckets; Bagged waste transferred by ladder truck; A barrel rolled from steel sheet or galvanized iron, internally coated with plastic, used as a waste chute; The company's dedicated construction waste pipe (chute). Shortcomings of makeshift methods: Formwork and plywood chutes have limited strength and durability, with many joints that crack and leak material. Corrugated…
The maximum erected height (overall length) of plastic debris chutes is limited to 40 m; chutes of steel or other materials are limited to 30 m. Considering wind, rain and other conditions, the chute should be tied down with ground ropes at 2–3 anchoring points to control sway and offset and keep the whole system vertical and stable. The steel support is a necessary part of chute mounting. The system consists of: Well-performing plastic pipes connected by chains, hooks and eyes; A carrying frame that fixes the hand winch and connects the waste duct; Window attachments (clamps) that embrace the window frame and carry the frame; A hand winch with support frame, used only for assembly and disassembly of the duct (the drop line coupled at ground level pulls the single pipes). Fastening takes place at the window attachments or…
As high-rise buildings multiply, construction waste grows in volume, and an effective waste-removal facility has become a practical necessity—this is the debris chute. It is dedicated to engineering solid-waste recovery, construction waste collection and removal, and renovation-waste collection in high-rise buildings; commonly called a debris chute, waste pipe, conduit or channel. As a solid-waste collection and removal facility, it is injection-molded from engineering plastic and supplied in assembled sets. Each barrel section can be stacked for storage and linked by chain; sections are easily socket-assembled and suspended on the building. After the project is completed and waste removed, they are dismantled top to bottom, stacked, and transferred to the next construction site for reassembly and reuse. As a front-end facility for solid-waste recovery, the debris chute is light in weight yet strong, quick to assemble and disassemble, moisture- and corrosion-resistant,…
The construction waste chute, also called construction waste duct or debris chute, is used to remove solid waste and construction debris from a high point to a lower level—for example concrete residue, brick rubble, mortar residue, renovation debris and metal waste—conveying it to a collection point or loading vehicle below for transport away. It is an environmental solid-waste collection and removal facility. The debris chute consists of a barrel body; hook ears on both sides, hinges and fasteners together form a complete chute body. Assembly on site is quick, and three workers can complete the whole assembly. Sections are firmly connected on site to a set length before lifting; lifting is generally done in 10 m, 20 m or 30 m stages. Before lifting, load-bearing brackets and possible feed-opening positions are arranged in advance so that each lift lands and…
The debris chute is designed for convenient use and nests section by section for efficient transport and stock. The tapered sections, wider at the top and narrower at the bottom, stack together to save space; sections connect by chains and ears and can be quickly assembled on arrival. Container loading: About 200 sections per 20-foot container, and about 500 sections per 40-foot container. High-rise erection options: The scheme can be chosen flexibly according to site conditions and space limits. Sections are suspended in series along the floors and fixed to the building structure through load-bearing supports and hangers. Common erection methods include: Suspended at an exterior-wall passage opening or window side; Suspended at a vertical opening in the floor slab; Placed on top of the building; Or fixed to supports and scaffolds. Installation process: First determine the number of…
The construction waste pipe, also called engineering waste collection pipe, construction waste duct, plastic waste duct, solid-waste recovery pipe or debris chute, is widely used in high-rise building construction, new-build and demolition projects, property renovation, large-vessel supply, and other high-altitude waste removal and solid-waste collection and transport. The product is assembled from sets of units and suspended for use inside or outside a high-rise building. It enables fast waste collection and removal, supports green environmental construction standards, reduces handling steps and labor time and cost, and improves solid-waste management and recycling rate. It manages the generation, removal, transport, landfill, crushing and recycling of every point of solid waste in a process-based, systematic way. After exhaust gas and wastewater, construction solid waste is the largest-volume third pollution stream in environmental protection; this facility is reusable, detachable and recyclable. Design typeIndustrial debris…
The engineering-plastic debris chute is injection-molded, assembled with stainless steel fittings and hot-dip galvanized hinges. It is used to collect solid waste, construction debris and other materials from top to bottom in various high-rise buildings and on ships. It is a mature replacement for metal chutes, wooden chutes, elevators, tower cranes and suspended platforms, meeting a wide range of use requirements and matching today's proliferation of high-rise construction and the future trend of an insufficient manual workforce. In operation the facility is efficient and quiet; it uses flexible buffered connections, is entirely gravity-driven, leak-free and free of secondary pollution, and is reusable and recyclable. Sections are socket-assembled in series from bottom to top, with a load-bearing support about every 20 m, fixed floor by floor along the building. Typical installation positions include the parapet of new buildings, the edge of…
The stainless-steel domestic waste chute shares essentially the same configuration as a hotel linen chute. Apart from the feed door and the discharge arrangement—material may drop vertically into a refuse bin or by-pass to an outside waste room, and an electric control system is optional—the barrel body, fire rating of the doors, material wall thickness and fabrication/installation workmanship are identical. The barrel diameter is usually slightly smaller than a hotel linen chute: linen chutes are mostly 610 mm, whereas this chute generally has a 550 mm diameter; feed-door dimensions can be the same as those of the linen chute. In spatial layout the chute is usually set at the end of a corridor, making it convenient to site the waste room outside the building or in the basement. The installation of the domestic waste chute is identical to that of…
Linen refers to bed sheets, bed linens, bath towels and towels in hotel rooms. Accordingly, this system is also known as a linen chute system, hotel linen chute, linen slide, linen shaft, laundry chute or linen duct. Main applications: collection and transfer of bedding in hotels, guesthouses and hospital wards within high-rise buildings, through the complete process to the laundry room. It achieves one-step, systematic, controlled, automated and intelligent handling, improving the efficiency of this otherwise cumbersome work: housekeeping staff simply drop linen at the end of the corridor and it reaches the laundry room. Introduction: The chute is generally rolled from stainless steel sheet into a cylindrical section (square ducts are also available). Assembled so that the inner wall has no obstructing protrusions, burrs or barbs that could scratch bedding, the sections form a smooth, free-flowing channel from top…
Our company provides professional supporting services and turnkey solutions for chimney problems, designing, installing and customizing various stainless steel chimneys, high-temperature boiler chimneys, double-wall stainless steel chimneys, and insulated heat-retaining chimneys. Applications of stainless steel chimneys: diesel generators, gas boilers, gas ovens, waste-gas treatment combustion furnaces, and general-purpose stainless steel exhaust ducts for high-temperature exhaust and corrosive gases in production, catering and industrial sectors. Materials: inner liner: stainless steel 304, 316, 444, or carbon steel Q235; outer jacket: stainless steel 304 or 201. Insulation layer: aluminum silicate wool (rock wool) or glass wool. Specifications: chimneys can be made in various profiles, mainly square and round. Round chimney outer diameter: 150 mm to 800 mm; maximum square chimney size: 1200 mm; insulation layer: 10 mm to 50 mm. Joints and sealing: installation ensures negative pressure meets operating requirements; sealing gaskets of…
The debris chute (also called construction waste pipe, waste collection pipe, removal pipe, renovation waste chute, or engineering plastic chute) is an environmental solid-waste facility for collecting and removing waste. It is suspended and installed at height, assembled from socket-spigot sections connected in series by hinges. Because tropical and humid environments require corrosion and moisture resistance, this product is widely used in the construction and renovation of various high-rise buildings, and is also suited to waste removal from ships at sea and from large vessels berthed far above the dock. Debris chutes are commonly used for solid-waste collection, removal and transport in high-rise residential, office and commercial buildings and renovation projects, and are also adopted by recycling and crushing environmental companies. The sections are molded from engineering plastic HDPE by injection molding, fitted with stainless steel fittings, galvanized hinges, support…
1. Use the reserved ventilation pipe shaft or light well of high-rise buildings, or install a garbage conveying channel on the outer wall to directly put the garbage into the garbage channel, and the garbage is transported to the designated ground garbage collection box through the pipeline under the action of gravity. 2. Imported polyethylene material is adopted, which is light in weight and convenient for installation, disassembly and replacement. 3. It has good impact strength and buffer strength, and reduces transmission noise. 4. Reduce throwing in the air, reduce injuries caused by falling objects and suppress building dust. 5. The product is large at the top and small at the bottom, with a certain taper. It is packaged together to save storage and transportation space. 6. It can be bent arbitrarily within a certain range to facilitate waste transportation…