The construction waste chute, also called construction waste duct or debris chute, is used to remove solid waste and construction debris from a high point to a lower level—for example concrete residue, brick rubble, mortar residue, renovation debris and metal waste—conveying it to a collection point or loading vehicle below for transport away. It is an environmental solid-waste collection and removal facility.

The debris chute consists of a barrel body; hook ears on both sides, hinges and fasteners together form a complete chute body. Assembly on site is quick, and three workers can complete the whole assembly. Sections are firmly connected on site to a set length before lifting; lifting is generally done in 10 m, 20 m or 30 m stages. Before lifting, load-bearing brackets and possible feed-opening positions are arranged in advance so that each lift lands and fixes in place at once, reducing later problems for the next section.
| Construction debris chute | Description |
| Quality assurance | Repeated disassembly and reassembly for reuse |
| After-sales service | Installation guidance, usage technical support |
| Project solution | Waste removal plan, installation plan |
| Application | Construction waste removal system engineering |
| Design type | Industrial debris chute, engineering debris chute |
| Origin | Guangzhou, China |
| Brand | Longkang |
| Type | Plastic construction debris chute |
| Model | D580-1280-400 |
| Application industry | Environmental engineering |
| Product color | Orange-red |
| Product name | Construction waste removal chute |
| Thickness | 5.0 mm - 5.5 mm |
| Length | 1280 mm |
| Material | PE |
| Manufacturing technology | Automated mold production |
| Accessories | Machined hook ears, standard hinges |
| Engineering installation fittings | Hangers and other installation brackets required by the customer |

Features of the construction waste passage
1. It can be installed in a reserved ventilation or light well of the high-rise, or on the exterior wall, forming a waste transport duct. Waste is fed directly into the duct and, under gravity, conveyed through the pipe to the designated ground collection bin.
2. Made of imported polyethylene material; light in weight, and convenient to install, disassemble and replace.
3. Good impact strength and cushioning strength, reducing transport noise.
4. Reduces airborne scattering, lowers the risk of falling-object injury, and suppresses construction dust.
5. The product is wider at the top and narrower at the bottom with a certain taper, so sections nest together to save storage and transport space.
6. It can bend within a certain range, making it convenient to convey waste to the designated position.
7. It can be reused through many cycles, and the waste material still retains high recycling value.
8. Wear-resistant with high impact strength: at (20 +/- 2) degC, a 1.0 kg D90 drop hammer from 1.5 m causes no cracking or damage.
9. Good UV resistance and weatherability; F2 rating under the outdoor product UV exposure test recognized by the US UL organization.
10. It can rise together with the climbing scaffold and also serve as a pump-wash pipe; concrete mortar and wastewater can be conveyed directly to the ground through the duct, achieving multi-purpose use of one pipe.
Installation methods: forklift lifting bracket with fork-pocket design; exterior-wall/windowsill bracket with tripod balance design; internal light-well bracket with rectangular frame design; rooftop bracket with lever-stabilized design; aerial scaffold bracket carrying the scaffold; integrated feed-opening bracket with hanger above the feed opening; marine/factory hanger with fixed-hanger design; and brackets for other purposes.