The debris chute is designed for convenient use and nests section by section for efficient transport and stock. The tapered sections, wider at the top and narrower at the bottom, stack together to save space; sections connect by chains and ears and can be quickly assembled on arrival.
Container loading: About 200 sections per 20-foot container, and about 500 sections per 40-foot container.
High-rise erection options: The scheme can be chosen flexibly according to site conditions and space limits. Sections are suspended in series along the floors and fixed to the building structure through load-bearing supports and hangers. Common erection methods include:

Installation process: First determine the number of sections and support positions according to building height and waste type; fix and link sections from the bottom up into a whole. Chains and ears are tightened section by section, and load-bearing supports and anchoring points are arranged according to structural loads. After installation, fencing and dust enclosure are set around the bottom discharge, with dust-suppression spray and other auxiliaries, before the chute goes into use. If waste must be removed continuously, an aerial waste bin can be matched at ground level; once the vehicle backs in, waste loads directly onto the truck.
Packing and transfer: Nested sections are shipped in batches, unloaded and laid along the working face. On dismantling and recovery, sections separate and nest again for transfer to the next reusable project. Avoid prolonged sun exposure and heavy stacking during transport and storage; chains, ears and other connectors are packed separately to prevent loss or damage.
Transport and nesting design: Each section is tapered, wider at the top and narrower at the bottom, so empty sections nest together and reduce bulk for container transport, site stacking and stock turnover. The smooth, rounded sections separate and nest without jamming; chains, ears and locks are packed in separate matched boxes to prevent loss or impact damage in transit. Based on the standard section, a 20-foot container holds about 200 sections and a 40-foot container about 500, meeting bulk supply for several high-rise projects entering site together.
Erection methods and conditions: In high-rise construction the chute is suspended in series along the floors; the fixing method should be chosen from the facade condition, floor openings, scaffold layout and site space:
In every case, supports, hanging points and anchors are arranged for the duct self-weight, waste load and wind load, with 2–3 ground rope-tie anchors where needed to control sway and offset.
On-site installation process: Before installation, confirm building height, floor count and waste type to determine section count, diameter and support positions; place sections from the bottom up and tighten chain ears section by section, keeping the tapered duct vertical and continuous; install load-bearing supports according to structural loads and recheck tightness; set fencing, enclosure and collection container around the bottom outlet with dust-suppression spray; check all connections before use. For continuous removal, match an aerial waste bin at ground level; once the truck backs in, waste drops directly into the body for removal.
Dismantling, recovery and reuse: At project end, dismantle section by section from the top down; release chain ears to separate and re-nest sections; recover and store supports and connectors separately for reuse on the next project. Clear residual waste from the duct before dismantling to avoid falling objects; store long-term on level ground away from sun and heavy stacking, and treat chains and locks against rust.
Comparison with other removal methods: Compared with manual carrying down floor by floor, the chute removes long-distance labor; workers only feed at the floor inlet. Compared with bagged waste transferred by construction elevator, it does not compete for vertical transport with people and materials. Compared with overhead throwing, the enclosed duct eliminates falling-object injuries and scattered dust, and avoids penalties or work stoppage for illegal scattering. For tight schedules, high floors and large waste volume, a complete chute matched with ground collection vehicles forms a continuous "floor feed — duct descent — ground loading" chain that balances safety, environmental protection and progress.
Safety notes: Inspect hanging points, supports, chains, ears and fasteners for looseness or wear during erection and use; do not overload or feed oversized hard objects; keep people away from the bottom outlet; suspend high-level work and reinforce or temporarily remove exposed sections in strong wind or thunderstorms. Support design, assembly guidance and matching parts can be supplied according to site conditions.