In October of the previous year, the district ecology and environment bureau detected abnormal readings from the online dust monitoring system at a construction site. A report reviewed by the district environmental monitoring station confirmed that the site\'s particulate concentration exceeded the limit set in the Standard for Particulate Matter Control on Construction Sites (DB31/964-2016). Enforcement officers arrived at the site immediately. On-site investigation found that the online dust monitoring equipment was operating normally and within its valid metrological calibration period; the maintenance contractor carried out regular servicing with records on file. The site was in the earthwork excavation stage, and dust-control measures were not fully implemented, mainly because parts of the site roads were dry and dusty.\nThe district ecology and environment bureau issued an order to correct, together with a notice of hearing for administrative penalty. Under Article 48(1)…
Regulatory documents and standards for construction waste management: CJJ XX-2017. The standard emphasizes source reduction and collection of construction waste, managed before transport and transfer. The debris chute provides good source collection, supporting subsequent compliant processing to meet standard requirements, supervising proper operation and preventing secondary pollution along the route. Apart from resource recovery, a dedicated facility is also needed when choosing backfill or landfill disposal. This waste tends to contain asphalt, glass and similar components, with limited recyclability and higher pollution impact; it is a key focus of supervision, making installation of a debris chute essential. Introduction to the construction debris chute: Fixed waste processing procedure required by construction waste regulations: Mobile waste processing procedure required by construction waste regulations: Classification and processing flow: Construction waste mainly includes excavated soil, concrete fragments, brickwork, mortar residue, wood, metal, glass, asphalt…
The maximum erected height (overall length) of plastic debris chutes is limited to 40 m; chutes of steel or other materials are limited to 30 m. Considering wind, rain and other conditions, the chute should be tied down with ground ropes at 2–3 anchoring points to control sway and offset and keep the whole system vertical and stable. The steel support is a necessary part of chute mounting. The system consists of: Well-performing plastic pipes connected by chains, hooks and eyes; A carrying frame that fixes the hand winch and connects the waste duct; Window attachments (clamps) that embrace the window frame and carry the frame; A hand winch with support frame, used only for assembly and disassembly of the duct (the drop line coupled at ground level pulls the single pipes). Fastening takes place at the window attachments or…
The construction waste chute, also called construction waste duct or debris chute, is used to remove solid waste and construction debris from a high point to a lower level—for example concrete residue, brick rubble, mortar residue, renovation debris and metal waste—conveying it to a collection point or loading vehicle below for transport away. It is an environmental solid-waste collection and removal facility. The debris chute consists of a barrel body; hook ears on both sides, hinges and fasteners together form a complete chute body. Assembly on site is quick, and three workers can complete the whole assembly. Sections are firmly connected on site to a set length before lifting; lifting is generally done in 10 m, 20 m or 30 m stages. Before lifting, load-bearing brackets and possible feed-opening positions are arranged in advance so that each lift lands and…
The debris chute is designed for convenient use and nests section by section for efficient transport and stock. The tapered sections, wider at the top and narrower at the bottom, stack together to save space; sections connect by chains and ears and can be quickly assembled on arrival. Container loading: About 200 sections per 20-foot container, and about 500 sections per 40-foot container. High-rise erection options: The scheme can be chosen flexibly according to site conditions and space limits. Sections are suspended in series along the floors and fixed to the building structure through load-bearing supports and hangers. Common erection methods include: Suspended at an exterior-wall passage opening or window side; Suspended at a vertical opening in the floor slab; Placed on top of the building; Or fixed to supports and scaffolds. Installation process: First determine the number of…
The construction waste pipe, also called engineering waste collection pipe, construction waste duct, plastic waste duct, solid-waste recovery pipe or debris chute, is widely used in high-rise building construction, new-build and demolition projects, property renovation, large-vessel supply, and other high-altitude waste removal and solid-waste collection and transport. The product is assembled from sets of units and suspended for use inside or outside a high-rise building. It enables fast waste collection and removal, supports green environmental construction standards, reduces handling steps and labor time and cost, and improves solid-waste management and recycling rate. It manages the generation, removal, transport, landfill, crushing and recycling of every point of solid waste in a process-based, systematic way. After exhaust gas and wastewater, construction solid waste is the largest-volume third pollution stream in environmental protection; this facility is reusable, detachable and recyclable. Design typeIndustrial debris…
The engineering-plastic debris chute is injection-molded, assembled with stainless steel fittings and hot-dip galvanized hinges. It is used to collect solid waste, construction debris and other materials from top to bottom in various high-rise buildings and on ships. It is a mature replacement for metal chutes, wooden chutes, elevators, tower cranes and suspended platforms, meeting a wide range of use requirements and matching today's proliferation of high-rise construction and the future trend of an insufficient manual workforce. In operation the facility is efficient and quiet; it uses flexible buffered connections, is entirely gravity-driven, leak-free and free of secondary pollution, and is reusable and recyclable. Sections are socket-assembled in series from bottom to top, with a load-bearing support about every 20 m, fixed floor by floor along the building. Typical installation positions include the parapet of new buildings, the edge of…
1. Use the reserved ventilation pipe shaft or light well of high-rise buildings, or install a garbage conveying channel on the outer wall to directly put the garbage into the garbage channel, and the garbage is transported to the designated ground garbage collection box through the pipeline under the action of gravity. 2. Imported polyethylene material is adopted, which is light in weight and convenient for installation, disassembly and replacement. 3. It has good impact strength and buffer strength, and reduces transmission noise. 4. Reduce throwing in the air, reduce injuries caused by falling objects and suppress building dust. 5. The product is large at the top and small at the bottom, with a certain taper. It is packaged together to save storage and transportation space. 6. It can be bent arbitrarily within a certain range to facilitate waste transportation…