As high-rise buildings multiply, construction waste grows in volume, and an effective waste-removal facility has become a practical necessity—this is the debris chute.

It is dedicated to engineering solid-waste recovery, construction waste collection and removal, and renovation-waste collection in high-rise buildings; commonly called a debris chute, waste pipe, conduit or channel. As a solid-waste collection and removal facility, it is injection-molded from engineering plastic and supplied in assembled sets.
Each barrel section can be stacked for storage and linked by chain; sections are easily socket-assembled and suspended on the building. After the project is completed and waste removed, they are dismantled top to bottom, stacked, and transferred to the next construction site for reassembly and reuse.
As a front-end facility for solid-waste recovery, the debris chute is light in weight yet strong, quick to assemble and disassemble, moisture- and corrosion-resistant, environmentally friendly, efficient and durable compared with other removal methods.

With a debris chute in place, the following problems are addressed and conditions improved:
Specifications: height 1280 mm, top opening 580 mm, bottom opening 500 mm, wall thickness 5 mm, 6 mm galvanized steel hinge, 3 mm stainless steel sheet-metal parts. Weight: about 13 kg per assembled set.