The debris chute (also called construction waste pipe, waste collection pipe, removal pipe, renovation waste chute, or engineering plastic chute) is an environmental solid-waste facility for collecting and removing waste. It is suspended and installed at height, assembled from socket-spigot sections connected in series by hinges.
Because tropical and humid environments require corrosion and moisture resistance, this product is widely used in the construction and renovation of various high-rise buildings, and is also suited to waste removal from ships at sea and from large vessels berthed far above the dock.
Debris chutes are commonly used for solid-waste collection, removal and transport in high-rise residential, office and commercial buildings and renovation projects, and are also adopted by recycling and crushing environmental companies.
The sections are molded from engineering plastic HDPE by injection molding, fitted with stainless steel fittings, galvanized hinges, support brackets and pulleys.
It can be installed on various high-rise buildings as required: inside a light well (shaft), on a balcony, or on the rooftop.

The universally adopted, non-metallic engineering-plastic debris chute effectively solves problems of noise, wear, impact and dust.
Against the background of reduced construction noise, lower PM2.5 dust, green construction management, safe-work permits, energy saving and emission reduction, a supporting facility such as the debris chute has become necessary. Especially where floors are high and hoists and elevators are tight, a dedicated solid-waste collection and removal chute is more efficient and cost-effective.
Reference data:
Features:
Installation: tools include a forklift and electric/manual hoist for lifting. Method: socket-spigot assembly, hinged in series, locked according to load-bearing supports and feed openings, extended floor by floor from bottom to top. Removal: top to bottom; one support per section, and a section cannot be removed individually.
Transport and storage: sections are stacked upside-down one on another to save space, convenient for storage, standby and long-distance transport.

Exterior-wall hoisting: the assembled chute sections are linked by a single hanger and slowly lifted into position by cranes or electric hoists, then locked to pre-installed double-arm lifting frames. The double-arm hanger carries the segmented load and impact and must support 3 tons. Branch supports are fixed by floor according to site conditions for guidance and stability, forming a safe, stable, compliant structure.
Shaft hoisting: the assembled sections are linked by a single hanger and slowly lifted into position, then locked to pre-installed cross-arm frames; otherwise the method is the same as exterior-wall installation.
Long-span hoisting: similar to exterior-wall hoisting, but all load rests on the top hanger; within a total length of 50 m it can be installed freely; above 50 m an additional load-bearing support is added to splice sections, so total height meets various requirements.