The construction waste pipe, also called engineering waste collection pipe, construction waste duct, plastic waste duct, solid-waste recovery pipe or debris chute, is widely used in high-rise building construction, new-build and demolition projects, property renovation, large-vessel supply, and other high-altitude waste removal and solid-waste collection and transport.
The product is assembled from sets of units and suspended for use inside or outside a high-rise building. It enables fast waste collection and removal, supports green environmental construction standards, reduces handling steps and labor time and cost, and improves solid-waste management and recycling rate. It manages the generation, removal, transport, landfill, crushing and recycling of every point of solid waste in a process-based, systematic way. After exhaust gas and wastewater, construction solid waste is the largest-volume third pollution stream in environmental protection; this facility is reusable, detachable and recyclable.

| Design type | Industrial debris chute, engineering debris chute |
| Origin | Guangzhou, China |
| Brand | Longkang |
| Type | Plastic construction debris chute |
| Model | D580-1280-400 |
| Application industry | Construction solid-waste environmental engineering |
| Product color | Orange-red |
| Product name | Construction waste removal chute |
| Thickness | 5.0 mm - 5.5 mm |
| Length | 1280 mm |
| Material | PE |
| Manufacturing technology | Automated mold production |
| Accessories | Machined hook ears, standard hinges |
Features of the construction debris chute:
1. It can be installed in a reserved ventilation or light well of the high-rise, or on the exterior wall, forming a waste transport duct. Waste is fed directly into the duct and, under gravity, conveyed through the pipe to a ground waste collection bin or waste transport vehicle.
2. Made of imported polyethylene material; light in weight, and convenient to install, disassemble and replace.
3. Good impact strength and cushioning strength, reducing transport noise.
4. Reduces airborne scattering, lowers the risk of falling-object injury, and eases construction dust.
5. The product is wider at the top and narrower at the bottom with a certain taper, so sections nest together to save storage and transport space.
6. It can bend within a certain range, making it convenient to convey waste to the installation position.
7. It can be reused through many cycles, and the waste material still retains high recycling value.
8. High wear and impact resistance: at (20 +/- 2) degC, a 1.0 kg D90 drop hammer from 1.5 m causes no cracking or damage.
9. Good UV resistance and weatherability; F2 rating under the outdoor product UV exposure test recognized by the US UL organization.
10. It can rise together with the climbing scaffold and also serve as a pump-wash pipe; concrete mortar and wastewater can be conveyed directly to the ground through the duct, achieving multi-purpose use of one pipe.
Installation of the construction debris chute:
Sections are socket-connected on site; barrels are linked to one another with chains and wire safety clips. Installation proceeds in sections of about 20 m, assisted by lifting tools such as manual/electric hoists, pulleys and forklift cranes. Sections are fixed one by one from the bottom upward and connected in series; once upper and lower parts are joined into a whole, fencing and dust enclosure are arranged around the bottom discharge and a stacking area, with anti-dust sprinklers and other auxiliary facilities, after which installation is complete and the chute can be put into use.
If waste needs to be removed at any time on site, an aerial waste bin is also provided at ground level: after the vehicle backs under the bin, waste loads directly onto the truck and is hauled away.