Debris chute (also called debris pipe or waste chute) is a vertical conveyance facility for solid waste in high-rise construction, building renovation, marine works and other high-altitude applications. The body is injection-molded from PE/HDPE engineering plastic at high temperature, with adequate wall thickness, impact and corrosion resistance, and light weight. It conveys concrete fragments, brick rubble, mortar residue, decoration debris and metal offcuts from floors to a ground collection point in an enclosed way, replacing manual carrying and overhead throwing.

Chute specifications:
| Item | Value |
| Warranty | 5 years |
| After-sale service | Other |
| Project solution capability | Other |
| Application | Construction |
| Design style | Traditional |
| Place of origin | China |
| Brand | Longkang |
| Model number | 580 |
| Type | PE |
| Material | PE |
| Color | Black, red |
| Thickness | 5 mm |
| Product name | Debris removal |
| Technology | Injection molding |
| Length | 1.28 m |
Product features:
Structure and working method: The chute comprises standard sections, feed sections, chain ears and load-bearing supports. Sections connect end to end through chains and ears, suspended vertically along the building height. Waste enters at the floor inlet and slides down the duct by gravity to a ground collection bin; the buffer slows descent and reduces impact and noise. Supports attach to the window side, slab, wall or scaffold according to site conditions.
Applications: Main works of high-rise residential and office buildings, commercial complexes, hotel and hospital renovation, old-building demolition, ship decks and factory workshops, and other projects requiring centralized enclosed conveyance of solid waste from height to ground.
Installation and maintenance: Before use, determine section count, diameter and support layout from building height and waste type; after installation, check that chains, ears, fasteners and the body are tight and undamaged before use. Inspect connectors and body wear regularly; damaged sections can be replaced individually at the connection. Store long-term away from sun and heavy stacking, and keep connectors sorted. Exact configuration can be discussed further according to floor height, waste type and site space.
Industry background: As urban high-rise and super-high-rise residential and commercial buildings increase, floors are high and working faces scattered, making waste removal a key site-management challenge. Manual carrying floor by floor is slow and labor-intensive; bagged waste relies on construction elevators, competing with people and materials for vertical transport; overhead throwing risks falling-object injury and dust scattering, violating safe and civilized-construction rules. Green-construction and dust-prevention standards generally require high-level waste to be removed through enclosed ducts or vertical machinery, and the debris chute is the dedicated enclosed facility designed to meet this requirement, balancing removal efficiency with lower safety and environmental risk.
Comparison with other removal methods: Compared with manual carrying, the chute removes long-distance labor so workers only feed at the floor inlet; compared with elevator transfer of bagged waste, it does not occupy the construction elevator or conflict with main works; compared with overhead throwing, the enclosed duct removes falling-object and scattering hazards and avoids correction orders or penalties for illegal scattering. For tight schedules, high floors and large waste volume, a complete chute paired with ground collection vehicles forms a continuous "floor feed — duct descent — ground loading" chain. Plastic chutes are light and quick to install for most high-rise conditions; for heavy-duty or special cases, a steel chute scheme can be compared.
Selection and matching accessories: Choose section count, diameter and support type from building height, floor count, waste type and single-feed volume, and choose window-side, slab, wall or scaffold attachment by facade condition. Accessories include standard and feed sections, buffer device, chain ears, load-bearing supports, plus dust-suppression spray, bottom outlet and collection bin, selected by site conditions. The supplier can provide the support scheme, complete chute configuration and matched connectors, and guide assembly, routine inspection and wear-part replacement, keeping the chute safe, stable and enclosed throughout the project.