The operating conditions of a construction waste chute differ greatly between new construction projects and demolition works. New construction produces relatively uniform waste with controllable particle size; demolition produces complex waste with large blocks and strong impact. Based on the characteristics of the two scenarios, Longkang explains the selection differences.
- Characteristics of New Construction Projects
- Waste type
- Main structure phase: crushed concrete chunks, rebar ends, formwork waste
- Masonry phase: broken bricks, mortar, blocks
- Decoration phase: wood chips, gypsum board, plastic pipes, packaging materials
- Waste is relatively uniform, particle size is controllable
- Waste volume
- Standard floor 2000–3000 m²
- Daily waste volume about 15–25 m³
- Varies by phase: highest during the masonry phase
- Impact intensity
- Waste is manually and controllably fed in
- Single piece weight ≤10kg
- Fall height is controllable
- Moderate impact
- Installation conditions
- Building structure is intact, external scaffold can be used
- Installed floor by floor as construction progresses
- Space is relatively regular
- Characteristics of Demolition Works
- Waste type
- Large concrete chunks, masonry, construction waste
- Contains rebar and metal parts
- Particle size is uneven; may include oversized blocks
- Complex waste mixed with metal and wood
- Waste volume
- Demolition works produce large waste volume
- Daily volume may reach 30–50 m³
- Concentrated rush demolition with distinct peaks
- Impact intensity
- Large concrete chunks can weigh 20–50 kg
- Strong falling impact
- Pipe is prone to damage
- May contain sharp metal that scratches the pipe wall
- Installation conditions
- Building structure is unstable, fixing points are hard to find
- Must be fed from the top demolition opening
- High safety risk
III. Comparison of Selection Differences
| Comparison item |
New construction |
Demolition works |
| Diameter |
500mm Standard |
600mm Heavy-duty |
| Wall thickness |
8mm |
10–12 mm |
| Per-section load capacity |
400kg |
800kg and above |
| Buffer section |
One every 25m |
One every 15m |
| Feed inlet grid |
Optional |
Required (to intercept oversized blocks) |
| Bottom reinforcement |
Standard |
Reinforced buffer + wear-resistant liner |
| Fixing method |
External scaffold clamp |
Structural anchor fixing |
| Service life |
5 years |
2–3 years (high wear) |
| Throughput requirement |
20 m³/day |
30–50 m³/day |
- Selection Recommendations for New Construction
- Choose 500mm Standard diameter
- Good versatility, handles waste from all phases
- Moderate cost
- Wall thickness 8mm
- Handles normal impact
- Moderate weight
- Fixing method
- Use external scaffold clamps
- One fixing point every 4–5 m
- Buffer design
- One 45° elbow buffer section every 25m
- For super high-rise, every 20m
- Accessories
- Each floor feed inlet with movable door
- Bottom connected to collection hopper
- Optional dust extraction interface
- Selection Recommendations for Demolition Works
- Choose 600mm Heavy-duty diameter
- Large waste does not cause blockage
- High throughput
- Wall thickness 10–12 mm
- Withstands strong impact
- Long wear-resistant life
- Reinforced buffer
- Buffer sections every 15m
- Double-layer buffer at the bottom
- Inner wall can be lined with wear-resistant rubber
- Grid at feed inlet
- Intercepts blocks larger than 450mm
- Prevents pipe blockage
- Prevents sharp objects such as rebar
- Fixing method
- Anchored into the structure with chemical anchors
- Cannot rely on unstable scaffolding
- One fixing point every 3m
- Safety measures
- Protective canopy at the top
- Warning zone at the bottom
- Check pipe integrity daily
- Selection for Mixed Projects
Many projects involve both new construction and demolition (e.g., expansion and renovation). Recommendations:
- Select based on the worst-case working condition (demolition phase)
- Choose 600mm Heavy-duty to cover both scenarios
- Denser buffer section arrangement
- Feed inlet fitted with grid (removable)
- One chute system used throughout the entire project cycle
VII. Longkang Services
Longkang provides differentiated solutions for different project types:
- New construction: Standard configuration, best cost-performance
- Demolition works: Heavy-duty + reinforced buffer, durable and reliable
- Mixed projects: designed for severe working conditions
- Technical engineers conduct site surveys to confirm installation conditions
- Provides safe-use training