In conventional construction, surplus concrete, mortar and similar residual materials are treated as construction waste. Traditionally this waste is loaded by hand, transported to the ground by the hoist or vertical elevator, and then loaded onto trucks for removal, which consumes a large amount of labor, material and power.
With a waste collection system, a vertical pipe is installed inside the elevator shaft or along the outside of the main structure. Concrete and mortar scraps produced during construction are conveyed through the pipe to the collection point, where a crusher breaks them down for use in trench backfill or roof slope-layer construction. The vertical waste chute can be assembled from 500 mm corrugated pipe or used plastic barrels; each floor is fitted with a feed hopper connected to the pipe, and the inlet and outlet are shielded with tarpaulin to suppress dust. Conveying waste through the vertical pipe lowers handling costs and energy loss, and the pipe sections are detachable and reusable.
The system suits high-rise and mid-rise residential blocks, apartments, hotels, office buildings and renovation or extension works. A typical chute assembly comprises standard sections, feed sections, a buffer device, chain connectors and a load-bearing support, with optional accessories such as a spray dust-suppression system and a receiving hopper. Replacing manual bagging and floor-by-floor carrying, it removes the need to toss waste from height, reduces falling-object and dust hazards, and frees up hoist and tower-crane capacity. Sections are joined by chains or plates, can be dismantled quickly and reused on the next project, keeping waste-removal measures economical over the whole construction period.