The top feed inlet is the opening through which waste is loaded into the chute; its design and installation directly affect ease of use and dust/splash control. This article details the top feed inlet installation.
- Feed Inlet Types
- Floor-side Feeding
- Chute runs along the exterior wall
- Loading opening on each floor from window or balcony
- Connects to the main chute via a side feed-in section
- Most common type
- Top Platform Feeding
- Feed platform provided at the top of the chute
- Load from the top-floor platform
- 90° turn into the vertical chute
- Suitable for segmented feeding in super high-rise buildings
- In-Elevator-Shaft Feeding
- Chute inside the elevator shaft
- Load from the elevator shaft doorway on each floor
- Provide feed inlet door
- Commonly used for indoor works
- Side Feed-in Section Installation
- Opening
- Cut a loading opening on the side of the main chute
- Size: 300×400mm
- Opening located near the floor elevation
- Install the Feed-in Section
- Feed-in section with door frame
- Fix at the opening with bolts or adhesive
- Provide sealing ring to prevent leakage
- Install the Movable Door
- Door connected with hinges
- Rubber strip sealed on the inner side of the door
- Door opening angle ≥180°
- Door fitted with latch (prevent wind from blowing open)
- Connect to Floor
- Feed inlet distance from floor platform ≤300mm
- Workers stand on the platform to load
- Provide temporary steps (if required)
III. Feed Inlet Height
- Distance from finished floor: 500–800 mm
- Convenient for workers to load
- Too low causes waste splash-out
- Too high makes loading laborious
- Feed Inlet Protection
- Movable Door
- Close after loading
- Prevent dust and splash
- Prevent accidental entry
- Observation Window
- Observation window on door (optional)
- Observe inside the chute
- Determine if there is blockage
- Protective Mesh
- Provide protective mesh above the feed inlet
- Prevent accidents from large waste
- Prevent tools from falling in
- Grating
- Provide grating inside the feed inlet
- Block oversized pieces
- Prevent blockage
- Number of Feed Inlets
- At least 1 feed inlet per floor
- 2 inlets if standard floor area >3000m²
- Feed inlet spacing ≤30 m
- Feed Inlet Signs
- Apply sign "Construction Waste Feed Inlet"
- Apply warning "Caution: Falling Objects"
- Apply operating instructions
- Apply reflective signs at night
VII. Common Problems
- Poor door sealing: replace sealing strip
- Inlet too high: provide steps
- Blockage: provide grating to block large pieces
- Dust: close door + spray
VIII. Longkang Feed Inlet Products
- Standard side feed-in section
- With movable door and observation window
- Sealing strip
- Protective mesh
- Customizable sizes