Installation of the Top Feed Inlet for Construction Waste Chutes

The top feed inlet is the opening through which waste is loaded into the chute; its design and installation directly affect ease of use and dust/splash control. This article details the top feed inlet installation.

  1. Feed Inlet Types
  2. Floor-side Feeding
  • Chute runs along the exterior wall
  • Loading opening on each floor from window or balcony
  • Connects to the main chute via a side feed-in section
  • Most common type
  1. Top Platform Feeding
  • Feed platform provided at the top of the chute
  • Load from the top-floor platform
  • 90° turn into the vertical chute
  • Suitable for segmented feeding in super high-rise buildings
  1. In-Elevator-Shaft Feeding
  • Chute inside the elevator shaft
  • Load from the elevator shaft doorway on each floor
  • Provide feed inlet door
  • Commonly used for indoor works
  1. Side Feed-in Section Installation
  2. Opening
  • Cut a loading opening on the side of the main chute
  • Size: 300×400mm
  • Opening located near the floor elevation
  1. Install the Feed-in Section
  • Feed-in section with door frame
  • Fix at the opening with bolts or adhesive
  • Provide sealing ring to prevent leakage
  1. Install the Movable Door
  • Door connected with hinges
  • Rubber strip sealed on the inner side of the door
  • Door opening angle ≥180°
  • Door fitted with latch (prevent wind from blowing open)
  1. Connect to Floor
  • Feed inlet distance from floor platform ≤300mm
  • Workers stand on the platform to load
  • Provide temporary steps (if required)

III. Feed Inlet Height

  • Distance from finished floor: 500–800 mm
  • Convenient for workers to load
  • Too low causes waste splash-out
  • Too high makes loading laborious
  1. Feed Inlet Protection
  2. Movable Door
  • Close after loading
  • Prevent dust and splash
  • Prevent accidental entry
  1. Observation Window
  • Observation window on door (optional)
  • Observe inside the chute
  • Determine if there is blockage
  1. Protective Mesh
  • Provide protective mesh above the feed inlet
  • Prevent accidents from large waste
  • Prevent tools from falling in
  1. Grating
  • Provide grating inside the feed inlet
  • Block oversized pieces
  • Prevent blockage
  1. Number of Feed Inlets
  • At least 1 feed inlet per floor
  • 2 inlets if standard floor area >3000m²
  • Feed inlet spacing ≤30 m
  1. Feed Inlet Signs
  • Apply sign "Construction Waste Feed Inlet"
  • Apply warning "Caution: Falling Objects"
  • Apply operating instructions
  • Apply reflective signs at night

VII. Common Problems

  1. Poor door sealing: replace sealing strip
  2. Inlet too high: provide steps
  3. Blockage: provide grating to block large pieces
  4. Dust: close door + spray

VIII. Longkang Feed Inlet Products

  1. Standard side feed-in section
  2. With movable door and observation window
  3. Sealing strip
  4. Protective mesh
  5. Customizable sizes