Consultation telephone

020-28185170

Contact us

Guangzhou Longcom Equipment Co., Ltd
National free service hotline: 4008-780-280
Company switchboard: 020-28185170
Tel.: 13002001280
Email contact: admin@longk.com
Factory address: Huangcun Industrial Park, Tanbu Town, Huadu District, Guangzhou

More contact

Key Quality Control Points for Plastic Construction Waste Chutes

Quality control is key to ensuring the safety and reliability of construction waste chutes. Longkang has established a full-process quality control system from raw material to finished product. This article explains the key quality control points in detail.

  1. Quality Control System

Longkang quality management process:

  1. Raw material inspection → 2. In-process patrol inspection → 3. Finished product inspection → 4. Outgoing inspection → 5. Traceability management
  2. Raw Material Quality Control
  3. Incoming inspection
  • HDPE raw material: check grade, batch number, production date
  • Performance testing: melt index, density, tensile strength
  • Appearance: uniform color, no impurities
  • Nonconforming raw material rejected
  1. Auxiliary material control
  • Carbon black masterbatch: content, dispersion
  • Antioxidant: purity
  • Sealing ring: material, dimensions
  • Buckle: material strength

III. In-Process Quality Control

  1. Extrusion process patrol inspection
  • Wall thickness measured every 2 hours
  • Check outer diameter dimensions
  • Observe appearance (bubbles, streaks)
  • Record process parameters
  1. Key control points
  • Wall thickness: 6 points measured per section
  • Diameter: online measurement
  • Length: fixed-length cutting
  • Appearance: visual inspection
  1. Nonconforming product handling
  • Marked and segregated
  • Reviewed for rework or scrap
  • Causes recorded
  • Prevent recurrence
  1. Finished Product Inspection Items
  2. Dimensional inspection
  • Outer diameter: ±2 mm
  • Wall thickness: ±0.5 mm
  • Length: ±5 mm
  • Out-of-roundness: ≤3 mm
  • Socket-and-spigot fit
  1. Appearance inspection
  • Smooth surface, no bubbles
  • No cracks, no holes
  • Uniform color
  • Smooth cut surface
  1. Performance inspection
  • Sampling inspection of tensile strength
  • Sampling inspection of impact strength
  • Trial assembly for sealing performance
  • Buckle tensile test
  1. Outgoing Inspection

Before each section leaves the factory:

  1. Check identification and labels
  2. Fitted with sealing rings and buckles
  3. End protection
  4. Accompanied by a certificate of conformity
  5. Packaged
  6. Traceability Management
  7. Batch number spray-printed on each section
  8. Production records archived
  9. Raw material batch traceable
  10. Outgoing records archived
  11. Customers can trace the production time and shift

VII. Quality Standards

Longkang products comply with:

  • Enterprise standard Q/LK JZJT
  • Reference GB/T 13663 (PE pipes for water supply)
  • Reference JG/T 229 (Plastic pipes for buildings)

VIII. Longkang Quality Commitment

  1. Nonconforming products never leave the factory
  2. Products accompanied by a certificate of conformity
  3. Warranty period 1 year (5 years under normal use)
  4. Free replacement for quality issues
  5. Lifetime technical support