For special engineering conditions, a standard construction waste chute may not fully meet requirements. Longkang supports non-standard customization, designing dedicated chute solutions based on specific project conditions. This article explains the key points of customized selection.
- When Customization Is Needed
Customization is recommended in the following cases:
- Super high-rise buildings over 100m
- Special installation locations (narrow alleys, indoor, special structures)
- Special waste types (containing large metal blocks, high-temperature waste, corrosive waste)
- Special specification requirements (non-standard diameter, non-standard section length)
- Special functional requirements (dust removal, noise reduction, monitoring)
- Customization Scope
- Specification customization
- Diameter: any specification between 400–800 mm
- Wall thickness: 6–15 mm
- Section length: 1.0
–2.5m
- Shape: round / square / oval
- Functional customization
- Buffer type: spiral buffer / enlarged buffer / multi-stage buffer
- Feed type: side feed / top feed / platform feed
- Discharge type: direct-drop / elbow / sealed / dust extraction interface
- Inspection type: observation opening / opening section / quick-release section
- Material customization
- Standard HDPE
- Thickened HDPE (high wear resistance)
- Flame-retardant HDPE (with flame retardant)
- Anti-static HDPE (prevents dust static electricity)
- Food-grade HDPE (special projects)
- Color customization
- Standard orange (safety color)
- Yellow, black, gray
- Can be printed with logo and warning signs
III. Customization Process
Step 1: Requirements communication
- Architectural drawings and construction plan
- Installation location conditions
- Waste type and waste volume
- Usage period
- Special requirements
Step 2: Site survey (large projects)
- Longkang technical engineers conduct on-site survey
- Measure installation location and structural conditions
- Confirm fixing point locations
- Photograph for records
Step 3: Solution design
- Selection calculation (diameter, sections, buffer)
- Installation plan (fixing method, routing)
- Safety design (protection, warning)
- Configuration list and quotation
- Solution delivered in 3 working days
Step 4: Drawing confirmation
- Provide installation layout drawings
- Structural load calculation report
- Production after customer confirmation
Step 5: Manufacturing
- Custom production according to drawings
- Customers can station at the factory to supervise key processes
- Pre-delivery inspection
Step 6: Delivery and installation
- Ship to site
- Installation guidance or professional team installation
- Acceptance and usage training
- Custom Design Key Points
- Structural load calculation
- Wind load calculation (high-rise wind vibration)
- Seismic load
- Pipe self-weight + waste weight
- Fixing point load
- Foundation bearing capacity
- Buffer design
- Calculation of waste falling speed
- Energy dissipated by each buffer stage
- Bottom speed controlled to ≤15m/s
- Maximum impact without pipe rupture
- Throughput calculation
- Waste density and volume
- Hourly throughput
- Pipe diameter matching
- Peak redundancy
- Safety design
- Anti-blockage design
- Anti-splash design
- Anti-fall design
- Warning signs
- Custom Case References
Case 1: Super high-rise residential building (120m)
- Diameter: 600mm Heavy-duty
- Buffer: one 45° buffer section every 12m, 9 stages total
- Fixing: chemical anchors into shear walls, one every 3m
- Accessories: sealed feed inlet per floor, bottom negative-pressure dust extraction
- Duration: 45 days production + 15 days installation
Case 2: Narrow alley demolition works
- Diameter: 500mm
- Installation location: narrow alley between two buildings (1.5m wide)
- Customization: short sections (1.0m) for installation in narrow spaces
- Elbow: elbow sections every 10m to reduce lateral force
- Fixing: triangular brackets anchored into buildings on both sides
Case 3: Metro tunnel project
- Waste type: muck + concrete chunks
- Diameter: 600mm Wear-resistant
- Inner wall lined with wear-resistant rubber
- Combined horizontal + vertical conveyance
- Dedicated horizontal section
- Customization Considerations
- Lead time: customization takes 15–45 days, plan in advance
- Accurate drawings: building dimensions and structural conditions must be accurate
- Installation conditions: whether the site has hoisting space
- Acceptance criteria: clarify delivery standards and acceptance methods
- After-sales support: warranty and repair for customized products
VII. Longkang Customization Service
Longkang supports non-standard customization of construction waste chutes:
- Free consultation from technical team
- Free site survey for large projects
- Solution delivered in 3 working days
- Produced per drawings, no arbitrary changes
- Pre-delivery inspection with test report
- On-site installation guidance nationwide
- Free repair within warranty period
- Lifetime technical support