This case shows the debris chute applied on a building project in Dongguan. The channel is formed by stacking chute sections vertically and fixing them to the scaffold or facade structure, serving vertical waste transfer and lowering manual handling cost, dust and scattering risk. The photos show the chute arrangement and installation; final configuration follows the project drawings and site conditions.