This case shows the construction waste chute installed during an apartment renovation in Shenzhen. For high floors where manual carrying is difficult, the chutes are mounted on the exterior wall, conveying demolition and renovation waste down to a ground collection area for regular removal. The photos show installation and use; accessory models are determined by site conditions.

Prev:Dongguan project of China Construction Third Bureau
Next:This is the last article