Longkang continuously improves its products. The 2024 new construction waste chute has been comprehensively upgraded in design, materials, process, and safety. This article introduces the highlights of the new product upgrade.
Carbon black content increased from 2% to 3%
Added UV absorber
Outdoor service life extended from 5 years to 8 years
More durable in southern regions with strong ultraviolet radiation
Added toughening agent
Low-temperature impact resistance improved by 30%
Still retains toughness at -40°C
More reliable in northern winters
Improved buckle structure
Faster installation (10 seconds per joint)
Anti-loosening design
Tensile resistance improved by 50%
Switched to high-quality EPDM compound
Compression set ≤20%
Sealing life extended from 1 year to 2 years
Dust-tight
Optimized 45° buffering angle
Inner wall thickened to 12 mm
Wear-resistant life doubled
Better buffering effect
III. Functional Upgrade
Improved hinge design
Easier opening and closing
Added observation window
Upgraded sealing strip
Enlarged inspection opening
Quick-release design
Easier cleaning
Better sealing
Vibration sensor
Blockage alarm
Temperature monitoring
Remote data transmission
Added anti-disengagement safety pin
Protective mesh at feed inlet as standard configuration
Bottom protective canopy design
Full set of warning signs
Grounding terminal (Anti-static model)
100% recyclable material
Added negative-pressure dust removal interface
Spray dust suppression interface
Sealed collection hopper design
Meets green construction requirements
Port protective caps
Binding and securing
Clear labeling
Accessories packed in separate bags
More convenient transport
VII. Service Upgrade
Selection software (input parameters to generate solutions)
Installation video tutorials
3D installation diagrams
Remote technical support
Nationwide service network