Application of Waste Chutes in Fine Decoration of Residential Communities

In the fine decoration stage of residential communities, decoration waste is large in volume, diverse in type, and generated at high floors. The Longkang construction waste chute is an efficient solution for waste clearance during the fine decoration stage. This article introduces its application.

  1. Characteristics of the Fine Decoration Stage

High floors: residential buildings are mostly high-rise

Diverse waste types: wood chips, plastic, cardboard, packaging, broken bricks

Concentrated schedule: waste concentrates during peak decoration periods

Dust requirements: dust control within the community

Multiple households under simultaneous construction: large waste volume

  1. Longkang Chute Application
  2. Equipment Selection

Diameter: 500 mm Standard

Wall thickness: 8 mm

Buffer section: one every 25 m

Suitable for light decoration waste

  1. Installation Method

Mounted along the exterior wall

Feed inlet on each floor

Collection hopper connected at the bottom

Spray dust suppression installed

  1. Operational Performance

Decoration waste on each floor is fed directly

No need to carry up and down

Centralized clearance

High efficiency

III. Simultaneous Construction by Multiple Households

The feed inlet on each floor serves multiple households

Waste is centrally conveyed through the chute

Does not occupy the elevator (decoration materials go via the elevator separately)

Avoids elevator damage

  1. Dust Control

Sealed pipeline

Sealed feed inlet door

Bottom spraying

Sealed collection hopper

Dust within the community meets standards

  1. Noise Control

HDPE low noise

Does not affect neighboring households

Daytime construction

Wrapped with sound-absorbing cotton (in sensitive areas)

  1. Economic Analysis

Manual transport: 200 yuan per person per day per floor, 5 persons required, 30,000 yuan per month

Longkang chute: purchase + installation approximately 12,000 yuan, construction period 3 months

Savings: approximately 78,000 yuan

Excluding efficiency gains and safety benefits

VII. Longkang Residential Project Service

Standard solution

Quick installation

Multi-floor feed inlets

Spray dust suppression

Dismantled and recycled after decoration is completed