In the fine decoration stage of residential communities, decoration waste is large in volume, diverse in type, and generated at high floors. The Longkang construction waste chute is an efficient solution for waste clearance during the fine decoration stage. This article introduces its application.
High floors: residential buildings are mostly high-rise
Diverse waste types: wood chips, plastic, cardboard, packaging, broken bricks
Concentrated schedule: waste concentrates during peak decoration periods
Dust requirements: dust control within the community
Multiple households under simultaneous construction: large waste volume
Diameter: 500 mm Standard
Wall thickness: 8 mm
Buffer section: one every 25 m
Suitable for light decoration waste
Mounted along the exterior wall
Feed inlet on each floor
Collection hopper connected at the bottom
Spray dust suppression installed
Decoration waste on each floor is fed directly
No need to carry up and down
Centralized clearance
High efficiency
III. Simultaneous Construction by Multiple Households
The feed inlet on each floor serves multiple households
Waste is centrally conveyed through the chute
Does not occupy the elevator (decoration materials go via the elevator separately)
Avoids elevator damage
Sealed pipeline
Sealed feed inlet door
Bottom spraying
Sealed collection hopper
Dust within the community meets standards
HDPE low noise
Does not affect neighboring households
Daytime construction
Wrapped with sound-absorbing cotton (in sensitive areas)
Manual transport: 200 yuan per person per day per floor, 5 persons required, 30,000 yuan per month
Longkang chute: purchase + installation approximately 12,000 yuan, construction period 3 months
Savings: approximately 78,000 yuan
Excluding efficiency gains and safety benefits
VII. Longkang Residential Project Service
Standard solution
Quick installation
Multi-floor feed inlets
Spray dust suppression
Dismantled and recycled after decoration is completed