Consultation telephone

020-28185170

Contact us

Guangzhou Longcom Equipment Co., Ltd
National free service hotline: 4008-780-280
Company switchboard: 020-28185170
Tel.: 13002001280
Email contact: admin@longk.com
Factory address: Huangcun Industrial Park, Tanbu Town, Huadu District, Guangzhou

More contact

Guangdong will be severely punished for dumping construction waste without authorization and failing to change within the time limit

Pubdate:2022-07-30 Views: 620Times Tags:

Those who dump or sprinkle construction waste without authorization and fail to correct within the time limit may face heavy fines. On July 28, the 45th meeting of the Standing Committee of the 13th Provincial People's Congress deliberated on the regulations of Guangdong Province on the management of construction waste (Draft) (hereinafter referred to as the "draft regulations"). In view of the low level of comprehensive utilization of construction waste in our province and the imperfect joint supervision mechanism of departments, Guangdong plans to legislate to clarify the contents of construction waste transportation, waste disposal site management, cross regional balanced disposal, etc., so as to provide legal guarantee for the construction of "waste free city". Construction waste transportation management is an important part of urban pollution prevention and control. The draft regulation stipulates that during the transportation of construction waste,…

Public solicitation of opinions on technical standards for reduction of construction waste at the construction site

Pubdate:2022-04-21 Views: 638Times Tags:

According to the letter of the standard and quota Department of the Ministry of housing and urban rural development on the preparation of two standards such as the technical standards for the reduction and quantification of construction waste on the construction site, the Ministry of housing and urban rural development organized China Construction First Bureau (Group) Co., Ltd. and other units to draft the industrial standard technical standards for the reduction of construction waste on the construction site (Draft for comments), which recently solicited opinions from the public. The deadline for feedback is December 22, 2021. The standard mainly includes 8 items: general provisions, terms and symbols, basic provisions, estimation, source reduction, collection and storage, reuse and recycling, measurement and emission, which are applicable to the reduction disposal of construction waste at the construction site. The standard specifies that construction…

Sales statistics of construction waste tank products in China from 2014 to 2018

Pubdate:2021-12-07 Views: 835Times Tags:

Through the in-depth investigation on the supply and demand situation, import and export situation and key production enterprises of the construction waste tank Market, this paper makes a comprehensive and in-depth analysis on the survey data such as the scale, competition, region, trend and attraction scope of the construction waste tank Market, comprehensively and deeply combs the current situation of the construction waste tank Market, and prudently and rigorously analyzes the development prospect of the construction waste tank Market

error: Content is protected !!